Performance, Safety & Quality Guarantee
Home / Dust Suppression /Performance and Workmanship Guarantee
The Suppression System efficiency is guaranteed to suppress 95% of the visible dust escaping during material process. PJ Tech Dust Suppression Systems are warranted against defects in workmanship and materials for period of 12 months from date of commissioning. Within the warranty period, the faulty product will be repaired or replaced by PJ Tech free of charge. Extended warranty period of the dust suppression system can be negotiated if regularly maintained by PJ Tech’s service team. All spare parts are stocked and available from PJ Tech.
Safety Assurance
Our equipment manufacturing processes as well as on site installations are performed safely and in a proper workmanship manner. The following measures are being undertaken to ensure safety and quality:
- Safety Induction – All PJ Tech personnel must undergo required client specific Safety Induction. All required certification must be obtained.
- Work Permits – Work permits must be obtained from the responsible Engineer prior to commencement of any works. Electrical Isolation – All machinery worked on must be electrically isolated. PJ Tech correctly marked padlocks to be used for this purpose.
- HIRA – Health & Injury Risk Assessment must be completed prior to any works.
- Hot Works – Fire extinguisher or water hose must be available at the location of hot works. The user must check integrity of welding machine as well as earthing prior to welding. Check integrity of cutting torch including hoses and flashback arrestors.
PPE – Required PPE (Personal Protective Equipment) must be worn at all times while present on site. All PPE must be in good condition. All personnel to consult plant specific information boards for lists of all PPEs to be worn. Should the sign not be available, required PPE must be consulted with a plant responsible person and respective PPE shall be worn for the job to be performed.
Tools – Only correct tools for a given task can be used. All tools to be inspected by the user for defects prior to works commencement. Any faulty tools cannot be used and must be replaced. Close attention should be given (but not limited to) to the following:
- Electrical cords/cables
- Hoses of cutting torch
- Grinding discs
- Hammer handles
- Chisels
Work at Heights – A safety harness must be worn for all tasks that need to be performed at height more than 2m above the floor level. Only safety harnesses in good condition must be used. Attachment points shall be provided and indicated to PJ Tech’s personnel by the responsible Engineer.
Tidiness & Cleanup – The construction site must be kept tidy at all times. All waste must be kept in one spot away from walkways, passages, etc. All waste to be removed to a designated by Client waste bins. This task must be performed at the end of each work day.
Toolbox / 5 Minute Safty Talks – All safety talks to be recorded and performed daily.
The standard PJ Tech quality control plan to be used.